Removed clamps and trimmed edges of sheeting thus far. Back drilled and cleaned up the holes for the spar studs and the landing gear mounts.
Prepped and glued the next section of plywood. The sheeting on the spar starts at 6 mm at the root and then steps down to 4 mm around the middle third, and then steps down again to 2 mm at the outboard third. Unfortunately I couldn't get any 4 mm ply from the supplier so I'm making my own by applying a layer of 1/8" ply and then a layer of 1/16" ply. The combined thickness of the two layers is about 4.75 mm.